
Add to Cart
Length of equipment installation | 11.8m (depend on design) | Effective width of equipment | 1.4m (depend on design) | Equipment height | 1.8m (depend on design) | |||||
Equipment molding process | A passive uncoiling machine,Seven axis automatic leveling machine, Automatic punching equipment,Main molding equipment, Automatic trip cutting equipment | |||||||||
Motor power | Automatic Kaiping machine |
1.5kw |
Punching machine |
5.5kw |
Host |
4.0kw | ||||
Working voltage | 380V+220kw | |||||||||
Production speed | 8 - 13 meters / min. The main motor is adjustable speed motor | |||||||||
Drive mode | Chain drive stop cutting | |||||||||
Machine forming shaft | A total of 13 rows of shaft / frame: 14 thick steel plate welding molding, vertical plate thickness 18mm | |||||||||
Shaft material | Bearing steel shaft diameter: 55mm solid shaft | |||||||||
Wheel material | Bearing steel; quenched and hardened by high frequency quenching | |||||||||
Molding part | The utility model is divided into a fine type wheel, the shape is rotated, the shaping effect is good, the friction between the wheel and the raw material is reduced, and the debugging is convenient and quick. | |||||||||
Numerical control system | PLC panel, KEL-320 display | |||||||||
Counter | The domestic photoelectric rotary encoder is adopted, A40S6-600-2-12-ACP | |||||||||
Cutting mode | 3Kw pumping station drives hydraulic shearing equipment to realize automatic cutting | |||||||||
Technological process | Open book: seven axis leveling: hydraulic punching, rolling forming, hydraulic cutting and blanking table | |||||||||
Thickness of pressboard | 0.3 - 0.8 mm | |||||||||
Warranty period | 12 months |
AQ
1. How to maintain the machine?
Answer: add mechanical lubrication equipment to chain, bearing and cutting slide every month. Add mechanical lubrication to the case every half a year.
2. Do you sell only standard machines?
A: No, most of our machines are built according to customers specifications, using top brand name components.
3. How many workers to operate the machine?
A:Only 1-2 workers.
4. How to visit your company?
a.Fly to Beijing airport: By high speed train From Beijing Nan Station to Cangzhou West Station(1 hour), then we can pick you up .
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou West station(4.5 hours), then we can pick you up.
5. What can you do if the machine broken?
Our machine's warranty period is 12months,if the broken parts can't be repaired,we can send the new parts to replace the broken parts for free,but you need pay the express cost yourself.if over warranty period,we can for to solve the problems via negotiation,and we supply the technical support for the whole life of the equipment.
6.How can I trust you that machines pasted testing running before shipping?
A: 1) We record the testing video for your reference. Or,
2) Please visit company and test machine if convenient.