RFM Cold Rolling Forming Machinery

ZTRFM COLD ROLLING FORMING MACHINERY Be with us to create the beautiful world.

Manufacturer from China
Verified Supplier
8 Years
Home / Products / Light Keel Roll Forming Machine /

Automatic Metal Roll Forming Equipment 380 V Voltage 3 Phase 15 Meters Per Minute

Contact Now
RFM Cold Rolling Forming Machinery
Visit Website
City:cangzhou
Province/State:hebei
Country/Region:china
Contact Person:MrsAmerilia cui
Contact Now

Automatic Metal Roll Forming Equipment 380 V Voltage 3 Phase 15 Meters Per Minute

Ask Latest Price
Video Channel
Model Number :c z purlin tile
Certification :CE
MOQ :1 set
Payment Terms :T/T, L/C, Western Union
Supply Ability :20 sets per month
Delivery Time :30 workdays after we receive the 30% advance payment
Packaging Details :packed with waterproof cloth and card board in container
Tile Type :Colored Steel
Dimension(L*W*H) :8000*1520*1500mm
Power(W) :15kw
Voltage :380v or any
Raw material thickness :1.5-3 mm
Roller material :45# Forged Steel
material of cutting blade :Cr12
Shaft material :bearing steel
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Automatic C Purlin Roll Forming Equipment 3 Phase 15 Meters Per Minute

1. Technical parameters of steel strips:

Material of steel strips: Q235;

Thickness of steel strips: 4.0-5.0mm;

Width of steel strips: 360mm;

Inner diameter of steel strips: Φ600;

Outside diameter of steel strips: ≤Φ1800;

Steel strips weight: 6T.

2. Technical parameters of finished product:

Finished product is made according to design drawing.

Product width: 200mm;

Product height: 60mm;

Product length: user advice

Length accuracy: ±1mm.

3. Technical parameters of production line:

Forming method: roll cold bending forming machine;

Line speed: 1-12m/min

Input direction: left input;

Electric power: 380V,50Hz;

Total power: 65KW.

4. Main technical parameters:

1). un-coiler:

2). Straightening body:

3). Forming mainframe:

4). Aligning device

5). tracking cut: (air source should be provided by user self).

6). Length-gauged reeling:

7). Control system:

5. Payment

30% for making contract effective, and the rest 70% should be paid before delivery.

6. Delivery

Delivery within 50 days after contract effective.

7. Inspection:

1. Finished product according to design drawing;

2. Machine according to supplier inspection standards;

3. Supplier should offer steel strips, if need to forming in supplier place.

8. installation and commissioning:

1, Supplier will send engineer to buyers place to install and debug, and also offer training service, if buyer need.

2, Buyer should provide help in lifting equipment and manual labor, also should provide feed, accommodation and body safety for engineer.

Automatic Metal Roll Forming Equipment 380 V Voltage 3 Phase 15 Meters Per Minute

Inquiry Cart 0